To do list:
Freshen up motor and 727. DONE
Heads are at precision cylinder heads in Utah for valve job and more porting, picked up 30 cfm on the same bench. DONE
Indy Intake was REALLY ported. DONE
Install Jesel Shaft rockers. DONE and sweet as fuck.
Send my converter to Ultimate Converter Concepts for a re-flash. DONE
Install my Spintech long tubes...the JD header primaries are too big for an NA motor. PENDING
Install MSD programmable ignition so I can pul timing at the hit if needed. DONE
Install Shifnoid electric shifter. DONE
Install CRT trans brake and Apex Machine button. DONE
Install Moroso oil accumulator and Canton valve. DONE
Install my Canton Oil plate. DONE
Re-wire entire truck. DONE
Install stiffer springs in my Detroit locker so it won't unlock. PENDING
Get the dash bar welded in. DONE
Scale truck and order Santuff Springs. PENDING
Install engine and start truck. PENDING
Print 10 second time slips. Fingers crossed. PENDING
Not much this year.